GB/T 19115.2-2003
AbolishedOff-grid type wind-solar photovoltaic hybrid generate electricity system of household-use--Part 2: Test methods
离网型户用风光互补发电系统 第2部分: 试验方法
Application Summary AI generated
This standard specifies the test methods for off-grid household wind-solar hybrid power generation systems, covering performance verification of components like wind turbines, photovoltaic panels, controllers, and batteries. It is applied in China to evaluate system reliability, energy output, and safety under simulated and real operating conditions for rural or remote residential installations. The standard ensures consistent testing protocols for manufacturers and certification bodies validating product compliance.
Related Standards
JB/T 51076-1999
Generators for Wind Turbine Generator Systems - Product Quality Grading (Internal Use)
GB/T 19568-2004
Assembling and installation regulation for wind turbine generator systems
GB/Z 25458-2010
Rules and procedures for conformity testing and certification of wind turbine generator system
GB/Z 25427-2010
Wind turbine generator systems - Lightning protection
GB/Z 25425-2010
Declaration of apparent sound power level and tonality values for the wind turbine
GB/Z 25426-2010
Wind turbine generator systems measurement of mechanical loads
GB/Z 35482-2017
Wind turbines—Time-based availability
GB/Z 35483-2017
Wind turbines—Production-based availability
Transparency note: The application summary and key sentences on this page were automatically generated by AI from the standard's original text. This content has not been human-verified and should not be used for compliance or regulatory purposes. Always refer to the official standard document from the issuing authority.