GB/T 19071.2-2018
ActiveWind turbines—Asynchronous generatorg—Part 2: Testing methods
风力发电机组 异步发电机 第2部分:试验方法
Application Summary AI generated
This standard specifies the testing methods for asynchronous generators used in wind turbines, covering parameters such as efficiency, temperature rise, vibration, and electrical performance. It is applied by manufacturers and testing laboratories to verify generator compliance with design specifications and operational safety requirements. The standard ensures reliable performance and grid compatibility for wind power generation systems.
Related Standards
JB/T 51076-1999
Generators for Wind Turbine Generator Systems - Product Quality Grading (Internal Use)
GB/T 19568-2004
Assembling and installation regulation for wind turbine generator systems
GB/Z 25458-2010
Rules and procedures for conformity testing and certification of wind turbine generator system
GB/Z 25427-2010
Wind turbine generator systems - Lightning protection
GB/Z 25426-2010
Wind turbine generator systems measurement of mechanical loads
GB/Z 25425-2010
Declaration of apparent sound power level and tonality values for the wind turbine
GB/Z 35482-2017
Wind turbines—Time-based availability
GB/Z 35483-2017
Wind turbines—Production-based availability
Transparency note: The application summary and key sentences on this page were automatically generated by AI from the standard's original text. This content has not been human-verified and should not be used for compliance or regulatory purposes. Always refer to the official standard document from the issuing authority.