GB/T 18709-2002
ActiveMethodology of wind energy resource measurementfor wind farm
风电场风能资源测量方法
Application Summary AI generated
This standard specifies the methodology for measuring wind energy resources, including site selection, sensor installation, data collection, and processing procedures. It is applied in the wind energy industry for pre-construction assessment of wind farms, ensuring accurate evaluation of wind potential for turbine placement and energy yield predictions. The standard is used by developers, engineers, and testing agencies during feasibility studies and resource surveys for onshore and offshore wind projects.
Related Standards
JB/T 51076-1999
Generators for Wind Turbine Generator Systems - Product Quality Grading (Internal Use)
GB/T 19568-2004
Assembling and installation regulation for wind turbine generator systems
GB/Z 25458-2010
Rules and procedures for conformity testing and certification of wind turbine generator system
GB/Z 25427-2010
Wind turbine generator systems - Lightning protection
GB/Z 25426-2010
Wind turbine generator systems measurement of mechanical loads
GB/Z 25425-2010
Declaration of apparent sound power level and tonality values for the wind turbine
GB/Z 35483-2017
Wind turbines—Production-based availability
GB/Z 35482-2017
Wind turbines—Time-based availability
Transparency note: The application summary and key sentences on this page were automatically generated by AI from the standard's original text. This content has not been human-verified and should not be used for compliance or regulatory purposes. Always refer to the official standard document from the issuing authority.