GB/T 18208.3-2011

Active

Post-earthquake field works - Part 3: Code for field survey

地震现场工作 第3部分:调查规范

Standard Type
GBT
ICS
91.120.25
CCS
P15
Status
Active
Issue Date
2011-12-30
Implementation
2012-03-01
Centralized Committee
中国地震局
Issuing Authority
中华人民共和国国家质量监督检验检疫总局、中国国家标准化管理委员会

Application Summary AI generated

GB/T 18208.3-2011 specifies procedures for conducting field surveys after an earthquake, including methods for assessing damage to buildings, infrastructure, and geological hazards. It is applied by Chinese seismic and construction authorities during post-earthquake emergency response to systematically collect data for disaster evaluation and reconstruction planning. The standard ensures consistent survey practices across affected regions, supporting accurate loss estimation and scientific decision-making for seismic resilience.

Related Standards

Transparency note: The application summary and key sentences on this page were automatically generated by AI from the standard's original text. This content has not been human-verified and should not be used for compliance or regulatory purposes. Always refer to the official standard document from the issuing authority.