GB/T 17680.3-1999

Abolished

Criteria for emergency planning and preparedness for nuclear power plants--Functional and physical characteristics of off-site emergency facilities

核电厂应急计划与准备准则 场外应急设施功能与特性

Standard Type
GBT
ICS
27.120.20
CCS
F77
Status
Abolished
Issue Date
1999-03-08
Implementation
1999-09-01
Centralized Committee
国家标准委
Issuing Authority
国家质量技术监督局

Application Summary AI generated

This standard specifies the functional and physical characteristics required for off-site emergency facilities supporting nuclear power plants. It is applied in the design, construction, and operation of facilities such as emergency response centers and communication hubs located outside the plant boundary. The standard ensures these facilities can effectively coordinate protective actions and public safety measures during a nuclear accident.

Related Standards

Transparency note: The application summary and key sentences on this page were automatically generated by AI from the standard's original text. This content has not been human-verified and should not be used for compliance or regulatory purposes. Always refer to the official standard document from the issuing authority.