GB/T 15761-1995

Active

Design and construction rulesfor nuclear island systems of 2×600MW PWR nuclear power plants

2×600MW压水堆核电厂核岛系统设计建造规范

Standard Type
GBT
ICS
27.120.20
CCS
F63
Status
Active
Issue Date
1995-12-08
Implementation
1996-10-01
Centralized Committee
国家标准委
Issuing Authority
国家技术监督局

Application Summary AI generated

This standard specifies the design and construction rules for the nuclear island systems of 2×600MW pressurized water reactor (PWR) nuclear power plants. It is applied in the engineering, procurement, and quality assurance processes for the reactor coolant system, safety systems, and auxiliary systems within the nuclear island. The standard ensures consistency and safety in the development of twin-unit PWR plants, particularly in the Chinese nuclear power industry.

Related Standards

Transparency note: The application summary and key sentences on this page were automatically generated by AI from the standard's original text. This content has not been human-verified and should not be used for compliance or regulatory purposes. Always refer to the official standard document from the issuing authority.