GB/T 13976-2021

Active

Radioactive source term of pressurized water reactor nuclear power plant for operation states

压水堆核电厂运行状态下的放射性源项

Standard Type
GBT
ICS
27.120.10
CCS
F72
Status
Active
Issue Date
2021-12-31
Implementation
2022-07-01
Centralized Committee
国家标准委
Issuing Authority
国家市场监督管理总局、中国国家标准化管理委员会

Application Summary AI generated

This standard specifies the methods for calculating and determining the radioactive source term in pressurized water reactor nuclear power plants during normal operation states, including power operation, shutdown, and refueling. It is applied by nuclear power plant designers, operators, and safety regulators to evaluate radiation doses to workers and the public, design shielding and ventilation systems, and manage radioactive waste. The standard ensures consistency in source term analysis for licensing, operational safety assessments, and environmental impact studies in the nuclear energy industry.

Related Standards

Transparency note: The application summary and key sentences on this page were automatically generated by AI from the standard's original text. This content has not been human-verified and should not be used for compliance or regulatory purposes. Always refer to the official standard document from the issuing authority.