GB/T 13632.2-2006

Active

Measurements for monitoring adequate cooling within the core of pressurized light water reactors Part 2: Instrumentation requirements during cold shutdown

监督压水堆堆芯充分冷却的测量要求 第2部分:冷停堆期间监测仪表的要求

Standard Type
GBT
ICS
27.120
CCS
F82
Status
Active
Issue Date
2006-03-02
Implementation
2006-08-01
Centralized Committee
国家标准委
Issuing Authority
国家标准委

Application Summary AI generated

This standard specifies the instrumentation requirements for monitoring adequate cooling in the core of pressurized light water reactors during cold shutdown conditions. It is applied in nuclear power plant operations to ensure that temperature, pressure, and water level measurements remain reliable when the reactor is not at full power, supporting safety assessments and operational procedures. The standard is used by nuclear engineers and safety regulators to verify that monitoring systems function correctly during maintenance, refueling, or other cold shutdown states.

Related Standards

Transparency note: The application summary and key sentences on this page were automatically generated by AI from the standard's original text. This content has not been human-verified and should not be used for compliance or regulatory purposes. Always refer to the official standard document from the issuing authority.