前言 → 1 范围 → 2 规范性引用文件 → 3 术语和定义 → 4 总体设计原则 → 5 总图设计 → 6 石灰石制备系统 → 7 烟气系统 → 8 SO₂吸收系统 → 9 副产品处置系统 → 10 废水处理系统 → 11 其他 → 12 热工自动化 → 13 电气设备及系统 → 14 建筑结构及暖通部分 → 15 消防 火灾报警及给水排水 Foreword → 1 Scope → 2 Normative References → 3 Terms and Definitions → 4 General Design Principles → 5 General Layout Design → 6 Limestone Preparation System → 7 Flue Gas System → 8 SO₂ Absorption System → 9 By-product Disposal System → 10 Wastewater Treatment System → 11 Others → 12 Thermal Automation → 13 Electrical Equipment and Systems → 14 Building Structure and HVAC → 15 Fire Protection, Fire Alarm and Water Supply and Drainage
Scope
This standard specifies the design requirements for wet flue gas desulfurization plants without bypass in thermal power plants. This standard applies to the simultaneous construction of limestone-gypsum wet flue gas desulfurization plants without bypass for new and expanded power plants with boilers of 670 t/h and above. The design of desulfurization plants without bypass added to existing power plants, desulfurization systems with existing bypass that need to cancel the bypass, or desulfurization plants for power plants with boilers below 670 t/h may refer to this standard for implementation; the design of other wet desulfurization plants may also refer to this standard.
本标准规定了火电厂无旁路湿法烟气脱硫装置的设计要求。本标准适用于670 t/h 及以上锅炉的新、扩建电厂同期建设的无旁路石灰石-石膏湿法烟气脱硫装置。已建电厂加装无旁路的脱硫装置、已建有旁路的烟气脱硫系统需要取消旁路或670 t/h 以下锅炉的电厂脱硫装置设计可以参照执行,其他湿法脱硫装置设计可参照执行。
Normative References
Keywords
Application Summary AI generated
Design institutes and engineering companies in thermal power plants use this standard to design wet flue gas desulfurization plants without bypass. It ensures that the desulfurization system can treat all flue gas from boilers efficiently, reducing sulfur dioxide emissions. This standard is crucial for new and retrofitted power plants to meet environmental compliance.
火电厂的设计单位和工程公司使用本标准来设计无旁路湿法烟气脱硫装置。该标准确保脱硫系统能够高效处理锅炉排放的全部烟气,减少二氧化硫排放。它对于新建和改造电厂实现环保达标至关重要。
AI Summary AI generated
This standard provides a technical guide for the design of wet flue gas desulfurization plants without bypass in thermal power plants, applicable to new and expanded power plants with boilers of 670 t/h and above. It specifies design principles, system components (such as limestone preparation, flue gas system, SO₂ absorption), and requirements for thermal automation and electrical equipment. The standard emphasizes a bypass-free design to ensure all flue gas is desulfurized, meeting environmental emission standards.
本标准为火电厂无旁路湿法烟气脱硫装置的设计提供技术导则,适用于670 t/h及以上锅炉的新建和扩建电厂。它规定了脱硫装置的设计原则、系统组成(如石灰石制备、烟气系统、SO₂吸收等)以及热工自动化、电气设备等要求。标准强调无旁路设计,确保全部烟气经脱硫处理,以符合环保排放标准。
Key Sentences extracted from text
本标准规定了火电厂无旁路湿法烟气脱硫装置的设计要求。
本标准适用于670 t/h 及以上锅炉的新、扩建电厂同期建设的无旁路石灰石-石膏湿法烟气脱硫装置。
脱硫装置设计应符合 GB 50660、GB 50049、GB 13223的规定。
锅炉排放的烟气全部直接通过湿法脱硫装置处理后排放。
喷淋塔: 最低层喷嘴下1.5m 至最高层喷嘴出口区域;
This standard specifies the design requirements for wet flue gas desulfurization plants without bypass in thermal power plants.
This standard applies to the simultaneous construction of limestone-gypsum wet flue gas desulfurization plants without bypass for new and expanded power plants with boilers of 670 t/h and above.
The design of the desulfurization plant shall comply with the provisions of GB 50660, GB 50049, and GB 13223.
All flue gas discharged from the boiler is directly treated by the wet desulfurization plant before emission.
Spray tower: from 1.5 m below the lowest nozzle to the outlet of the highest nozzle.