GB/T 8117.3-2014
ActiveRules for steam turbine thermal acceptance test―Part 3: Method C―Thermal performance verification tests of retrofitted steam turbines
汽轮机热力性能验收试验规程 第3部分:方法C 改造汽轮机的热力性能验证试验
Application Summary AI generated
This standard specifies the testing procedures and evaluation methods for verifying the thermal performance of retrofitted steam turbines using Method C. It is applied in power plants and industrial facilities where existing steam turbines have undergone modifications, such as upgrades to blades, seals, or control systems, to confirm that the retrofit achieves the guaranteed efficiency and output improvements. The standard ensures consistent and accurate performance validation under field conditions, supporting contractual acceptance and operational benchmarking.
Related Standards
GB/T 15135-2002
Gas turbines--Vocabulary
GB/T 18929-2002
Acceptance tests for combined-cycle power plants
GB/T 11805-1999
Basic specifications of automatic control components (devices) and their related system forhydroturbine-generating sets
GB/T 14793-1993
Assembling technical specifications for gas turbine
GB/T 14098-1993
Gas turbine--Noise
GB/T 13674-1992
Applied specification of fuels for light weight gas turbine
GB/T 13675-1992
Light weight gas turbines preparation for shipping and installation
GB/T 4773-1984
Parameters of steam turbines in conventional combined heating and power stations
Transparency note: The application summary and key sentences on this page were automatically generated by AI from the standard's original text. This content has not been human-verified and should not be used for compliance or regulatory purposes. Always refer to the official standard document from the issuing authority.