GB/T 46876-2025
UpcomingSpecification for operation and management of flue gas carbon dioxide capture and compression facility
烟气二氧化碳捕集与压缩装置运行管理规范
Application Summary AI generated
This standard specifies operational procedures, safety requirements, and management protocols for flue gas carbon dioxide capture and compression facilities. It is applied in industries such as power generation, steelmaking, and cement production where post-combustion CO2 capture systems are installed, ensuring efficient and safe operation of the capture and compression equipment. The standard also provides guidelines for monitoring, maintenance, and performance evaluation to support carbon reduction targets.
Related Standards
GB/Z 18718-2002
Energy saving directives for heat treatment
GB/T 33857-2017
General principles for energy conservation assessment—Combined heat and power generation project
GB/T 19064-2003
Solar home system specifications and test procedure
GB/T 18293-2001
On-line measurement on operating efficiency of power convertor equipments
GB/T 18292-2001
Economical operation of boilers for daily life
GB/T 15320-2001
Evaluation guides of the energy conservation products
GB/T 2588-2000
The general principles for calculation of thermal effic-iency of equipment
GB/T 17954-2000
Economical operation of industrial boilers
Transparency note: The application summary and key sentences on this page were automatically generated by AI from the standard's original text. This content has not been human-verified and should not be used for compliance or regulatory purposes. Always refer to the official standard document from the issuing authority.