GB/T 43318-2023
ActiveGas turbine combined cycle power plants—Thermal performance tests
燃气轮机联合循环电站 热力性能试验
Application Summary AI generated
This standard specifies the test methods, calculation procedures, and evaluation criteria for conducting thermal performance tests on gas turbine combined cycle power plants. It is applied in the energy industry for verifying the power output, heat rate, and efficiency of new or retrofitted combined cycle units under defined operating conditions. The standard is used by plant operators, engineers, and testing agencies during commissioning, acceptance, or performance guarantee testing.
Related Standards
GB/T 15135-2002
Gas turbines--Vocabulary
GB/T 18929-2002
Acceptance tests for combined-cycle power plants
GB/T 11805-1999
Basic specifications of automatic control components (devices) and their related system forhydroturbine-generating sets
GB/T 14793-1993
Assembling technical specifications for gas turbine
GB/T 14098-1993
Gas turbine--Noise
GB/T 13674-1992
Applied specification of fuels for light weight gas turbine
GB/T 13675-1992
Light weight gas turbines preparation for shipping and installation
GB/T 4773-1984
Parameters of steam turbines in conventional combined heating and power stations
Transparency note: The application summary and key sentences on this page were automatically generated by AI from the standard's original text. This content has not been human-verified and should not be used for compliance or regulatory purposes. Always refer to the official standard document from the issuing authority.