GB/T 42797-2023

Active

Carbon dioxide capture, transportation and geological storage—Pipeline transportation systems

二氧化碳捕集、输送和地质封存 管道输送系统

Standard Type
GBT
ICS
75.200
CCS
E 98
Status
Active
Issue Date
2023-05-23
Implementation
2023-09-01
Centralized Committee
国家标准委
Issuing Authority
国家市场监督管理总局、国家标准化管理委员会

Application Summary AI generated

This standard specifies technical requirements for the design, construction, operation, and safety management of pipeline systems used to transport captured carbon dioxide for geological storage. It is applied in carbon capture, utilization, and storage (CCUS) projects, particularly within the petroleum and chemical industries, where CO₂ is transported from capture facilities to injection sites for permanent underground storage. The standard ensures pipeline integrity and leak prevention under high-pressure and corrosive conditions unique to CO₂ transport.

Related Standards

Transparency note: The application summary and key sentences on this page were automatically generated by AI from the standard's original text. This content has not been human-verified and should not be used for compliance or regulatory purposes. Always refer to the official standard document from the issuing authority.