GB/T 38317.31-2019
ActiveSpace and fixing dimensions for smart electricity meter—Part 31: Electrical interface
智能电能表外形结构和安装尺寸 第31部分:电气接口
Application Summary AI generated
This standard specifies the electrical interface requirements for smart electricity meters, including pin definitions, signal characteristics, and communication protocols. It is applied in the manufacturing and installation of smart meters used in residential and commercial power metering systems across China. The standard ensures interoperability and reliable data exchange between meters and auxiliary devices like concentrators or load control units.
Related Standards
GB/T 12113-2003
Methods of measurement of touch current and protective conductor current
GB/T 16896.1-2005
Instruments and software used for measurements in high-voltage impulse tests Part 1:requirements for instruments
GB/Z 21192-2007
Space and fixing dimensions for electricity energy meter
GB/Z 26082-2010
Nanomaterials-Measuring method for DC magnetic susceptibility (magnetic moment)
GB/Z 17215.611-2021
Electricity metering data exchange—The DLMS/COSEM suite—Part 11: Template for DLMS/COSEM communication profile standards
GB/Z 17215.651-2022
Electricity metering data exchange—The DLMS/COSEM suite—Part 51:Application layer protocols
GB/Z 17215.669-2022
Electricity metering data exchange—The DLMS/COSEM suite—Part 69:Mapping between the common information model message profiles (IEC 61968-9) and DLMS/COSEM (IEC 62056) data models and protocols
GB/Z 17215.652-2022
Electricity metering data exchange—The DLMS/COSEM suite—Part 52:Communication protocols management distribution line message specification (DLMS) server
Transparency note: The application summary and key sentences on this page were automatically generated by AI from the standard's original text. This content has not been human-verified and should not be used for compliance or regulatory purposes. Always refer to the official standard document from the issuing authority.