GB/T 35972-2018
ActiveEnergy-saving commissioning method of heating and air conditioning system
供暖与空调系统节能调试方法
Application Summary AI generated
This standard specifies the procedures and technical requirements for commissioning heating and air conditioning systems to achieve energy-saving operation. It is applied in the construction industry for newly built, expanded, or renovated buildings, guiding engineers and technicians to adjust system parameters such as water flow, air volume, and temperature controls to optimize energy efficiency. The standard is used during the system acceptance and handover phase to verify that the installed HVAC equipment meets design energy performance targets.
Related Standards
GB/T 19249-2003
Reverse osmosis water treatment equipment
GB/T 16895.3-2004
Electrical installations of buildings--Part 5-54:Selection and erection of electrical equipment--Earthing arrangements,protective conductors and protective bonding conductors
GB/T 7725-2004
Room air conditioners
GB/T 16895.22-2004
Electrical instal lations of buildings--Part 5-53:Selection and erection of electrical equipment isolation,switching and control--Section 534:Devices for protection against overvoltages
GB/Z 28598-2012
Study of the use of lifts for evacuation during an emergency
GB/Z 28597-2012
Lifts and escalators subject to seismic conditions - Compilation report
GB/Z 31822-2015
Study report on the safety requirements of public service escalators and moving walks
GB/Z 35850.3-2021
Programmable electronic systems in safety-related applications for lifts (elevators), escalators and moving walks—Part 3: Life cycle guideline for programmable electronic systems related to PESSRAL and PESSRAE
Transparency note: The application summary and key sentences on this page were automatically generated by AI from the standard's original text. This content has not been human-verified and should not be used for compliance or regulatory purposes. Always refer to the official standard document from the issuing authority.