GB/T 35150.3-2024

Active

Technical requirements of dry process cement production complete equipment— Part 3: Cement preparation system

新型干法水泥生产成套装备技术要求 第3部分:水泥制备系统

Standard Type
GBT
ICS
91.110
CCS
Q92
Status
Active
Issue Date
2024-08-23
Implementation
2025-03-01
Centralized Committee
中国建筑材料联合会
Issuing Authority
国家市场监督管理总局、国家标准化管理委员会

Application Summary AI generated

This standard specifies technical requirements for the cement preparation system within dry process cement production lines, covering equipment such as grinding mills, separators, and conveying systems. It is applied in the construction and cement manufacturing industry to ensure the performance, safety, energy efficiency, and reliability of machinery used in the final stage of cement production. The standard serves as a technical basis for equipment design, procurement, and acceptance testing in cement plants.

Related Standards

Transparency note: The application summary and key sentences on this page were automatically generated by AI from the standard's original text. This content has not been human-verified and should not be used for compliance or regulatory purposes. Always refer to the official standard document from the issuing authority.