ActiveEngineering data handover for power plants
发电工程数据移交
Application Summary AI generated
This standard specifies the requirements, content, and format for the structured handover of engineering data from the construction phase to the operation and maintenance phase of power plants. It is applied in the Chinese power generation industry, covering thermal, hydro, wind, and solar plants, to ensure that all digital engineering records (e.g., design documents, equipment specifications, and as-built models) are delivered in a consistent, machine-readable format for lifecycle management. The standard is used by project owners, EPC contractors, and system integrators during commissioning and final acceptance testing.
Related Standards
GB/T 12325-2003
Power quality--Admissible deviation of supply voltage
GB/T 14541-2005
Guide for maintenance and supervision of in-service mineral turbine oil used for power plants
GB/T 14542-2005
Guide for maintenance and supervision of transformer oil in service
GB/Z 21193.3-2007
Fossil-fired steam power stations - Part 3: Steam-temperature controls
GB/Z 21193.2-2008
Fossil-fired steam power stations - Part 2: Drum-level control
GB/T 18481-2001
Power quality--Temporary and transient overvoltages
GB/T 15153.2-2000
Telecontrol equipment and systems--Part 2:Operating conditions--Section 2:Environmental conditions (cli-matic,mechanical and other non-electrical influences)
GB/T 17627.2-1998
High-voltage test techniques for low voltage equipment--Part 2:Measuring system and test equipment
Transparency note: The application summary and key sentences on this page were automatically generated by AI from the standard's original text. This content has not been human-verified and should not be used for compliance or regulatory purposes. Always refer to the official standard document from the issuing authority.