GB/T 32451-2015
ActiveSpace project management
航天项目管理
Application Summary AI generated
GB/T 32451-2015 specifies management requirements for space projects, covering phases from planning and design to production and operation. It is applied in China's aerospace industry for managing spacecraft development, satellite missions, and related ground systems. The standard ensures consistent project oversight, risk control, and quality assurance across government and commercial space programs.
Related Standards
GB/T 47426-2026
General specification for BDS/GNSS receivers onboard high earth orbit satellite
GB/Z 42245-2022
Space environment—Operational estimation of the solar wind energy input into the Earth's magnetosphere by means of the ground-based magnetic polar cap (PC) index
GB/Z 42244-2022
Space environment—Procedure for obtaining worst case and confidence level of fluence using the quasi-dynamic model of earth's radiation belts
GB/T 28874-2012
Specification for level of data products for space science experiments
GB/T 29075-2012
Probabilistic risk assessment procedure for spacecrafts
GB/T 30214-2013
Aircraft—Non-metallic pulleys with ball bearings for control cables—Dimensions and loads
GB/T 32297-2015
Simulation requirements for space control system
GB/T 34513-2017
Space debris mitigation requirements
Transparency note: The application summary and key sentences on this page were automatically generated by AI from the standard's original text. This content has not been human-verified and should not be used for compliance or regulatory purposes. Always refer to the official standard document from the issuing authority.