GB/T 30370-2013
AbolishedGuide of primary frequency control test and performance acceptance for thermal power generating units
火力发电机组一次调频试验及性能验收导则
Application Summary AI generated
This standard provides a unified methodology for conducting primary frequency control tests and evaluating the performance of thermal power generating units. It is applied in the Chinese power industry to ensure that grid-connected thermal power plants can rapidly adjust their output in response to frequency deviations, thereby maintaining grid stability. The guide is used by power plant operators, grid dispatchers, and testing agencies during commissioning, routine maintenance, and performance acceptance procedures.
Related Standards
NY/T 1223-2006
Biogas-powered generating sets
GB/T 755.2-2003
Methods for determininglosses and efficiency of rotating electrical machinery from tests(excluding machines for traction vehicles)
GB/T 997-2003
Classification of types of construction and mounting arrangements for rotating electrical machines(IM code)
GB/T 5321-2005
Measurement of loss and efficiency for electrical machine by the calorimetric method
GB/Z 32519.2-2016
1000MW Class Hydro-generators—Part 2: Testing And Inspecting Guide
GB/Z 32519.1-2016
1000MW Class Hydro-generator—Part 1: Technical Guide
GB/Z 32519.3-2016
1000MW Class Hydraulic-generator—Part 3: Quality Inspection Standards For Installation
GB/Z 20833.5-2023
Rotating electrical machines—The winding insulation—Part 5:Off-line measurement of partial discharge inception voltage under repetitive impulse voltage
Transparency note: The application summary and key sentences on this page were automatically generated by AI from the standard's original text. This content has not been human-verified and should not be used for compliance or regulatory purposes. Always refer to the official standard document from the issuing authority.