Application Summary AI generated

GB/T 30013-2013 specifies the fundamental conditions that must be met before a new urban rail transit line can commence trial operation, covering infrastructure, equipment, personnel, and safety management. It is applied by metro operators and regulatory authorities in China to verify system readiness, ensuring passenger safety and operational reliability during the initial passenger-carrying phase. The standard serves as a mandatory assessment benchmark for all newly built or extended urban rail systems, including subways and light rail.

Related Standards

Transparency note: The application summary and key sentences on this page were automatically generated by AI from the standard's original text. This content has not been human-verified and should not be used for compliance or regulatory purposes. Always refer to the official standard document from the issuing authority.