GB/T 28808-2012

Abolished

Railway applications - Communication, signaling and processing systems - Software for railway control and protection systems

轨道交通 通信、信号和处理系统 控制和防护系统软件

Standard Type
GBT
ICS
45.060
CCS
S04
Status
Abolished
Issue Date
2012-11-05
Implementation
2013-02-01
Centralized Committee
国家铁路局
Issuing Authority
中华人民共和国国家质量监督检验检疫总局、中国国家标准化管理委员会

Application Summary AI generated

This standard specifies the software lifecycle processes and requirements for developing safety-related software in railway control and protection systems, such as train control, interlocking, and signaling systems. It is applied by engineers and manufacturers in the railway industry to ensure software reliability and functional safety, particularly in systems that manage train operations and prevent collisions. The standard is used during software design, verification, and validation to meet safety integrity levels (SIL) as defined in related railway safety standards.

Related Standards

Transparency note: The application summary and key sentences on this page were automatically generated by AI from the standard's original text. This content has not been human-verified and should not be used for compliance or regulatory purposes. Always refer to the official standard document from the issuing authority.