GB/T 26471-2023
ActiveTower crane—Rules of installation, disassembly and climbing
塔式起重机 安装、拆卸与爬升规则
Application Summary AI generated
This standard specifies the safety requirements, operational procedures, and technical conditions for the installation, disassembly, and climbing of tower cranes. It is applied in the construction industry for the on-site assembly, vertical extension, and dismantling of tower cranes used in building and infrastructure projects. The standard ensures safe and standardized operations during these critical phases to prevent accidents and structural failures.
Related Standards
GB/T 27696-2011
Forged steel eyebolts grade 4 for general lifting purposes
GB/T 19683-2005
Rail mounted transtainer
GB/T 18875-2002
Cranes--Spare parts manual
GB/T 18874.5-2002
Cranes--Information to be provided--Part 5:Overhead travelling cranes and portal bridge cranes
GB/T 18874.1-2002
Cranes--Information to be provided--Part 1:General
GB/T 18453-2001
Cranes--Maintenance manual--Part 1:General
GB/T 18439-2001
Harbour crane--General requirements for stability
GB/T 18438-2001
Harbour crane--Acceptance test rule
Transparency note: The application summary and key sentences on this page were automatically generated by AI from the standard's original text. This content has not been human-verified and should not be used for compliance or regulatory purposes. Always refer to the official standard document from the issuing authority.