GB/T 25342-2026
UpcomingVocabulary for railway permanent-way engineering—Construction machinery
铁路工务工程词汇 施工机械
Application Summary AI generated
GB/T 25342-2026 defines standardized terminology for construction machinery used in railway permanent-way engineering, including equipment for track laying, ballast handling, and maintenance. It is applied in the Chinese railway industry to ensure consistent communication among engineers, procurement professionals, and operators during design, specification, and operation of track construction machinery. This standard facilitates clear documentation and technical exchanges across railway projects and related testing contexts.
Related Standards
GB/T 25021-2010
Track inspection car
GB/T 10082-2010
Technical requirements of heavy duty railway motor trolley
GB/T 25339-2010
Railway track-laying machine
GB/T 25337-2010
General technical specifications for rail heavy-duty permanent way machinery
GB/T 25336-2010
Test and inspection method for rail heavy-duty permanent way machinery
GB/T 25335-2010
Railway T-girder erecting machine
GB/T 25330-2010
General technical specifications for ballast cleaning machinery
GB/T 25342-2010
Vocabulary for railway track-laying machine and girder-erecting machine
Transparency note: The application summary and key sentences on this page were automatically generated by AI from the standard's original text. This content has not been human-verified and should not be used for compliance or regulatory purposes. Always refer to the official standard document from the issuing authority.