GB/T 25217.13-2019
ActiveMethods for test, monitoring and prevention of rock burst—Part13: Prevention method of deep-hole blasting in roof
冲击地压测定、监测与防治方法 第13部分:顶板深孔爆破防治方法
Application Summary AI generated
This standard specifies the technical requirements, design parameters, and implementation procedures for using deep-hole blasting in mine roofs to prevent rock bursts. It is applied in underground coal mines and other mining operations where high-stress conditions in roof strata pose a risk of sudden, violent rock failures. The standard guides engineers in planning blast hole layouts, charge structures, and safety measures to proactively relieve stress and reduce rock burst hazards.
Related Standards
GB/T 18341-2001
Specifications of survey for geological and mineral resources exploration
GB/T 12719-1991
Exploration specification of hydrogeologyand engineering geology in mining areas
GB/T 10202-1988
Code of comprehensive geological exploration and survey in the coastal zone
GB/T 2009-1987
Method of sampling and sample preparation of bauxite in bulk
GB/T 2011-1987
Method of sampling and sample preparation of manganeseores in bulk
GB/T 2010-1987
Method of sampling and sample preparation of talc in bulk
GB/T 2008-1987
Method of sampling and sample preparation of fluorspar in bulk
GB/T 22206-2008
Classification of environmental geology of mine
Transparency note: The application summary and key sentences on this page were automatically generated by AI from the standard's original text. This content has not been human-verified and should not be used for compliance or regulatory purposes. Always refer to the official standard document from the issuing authority.