GB/T 22198-2008

Active

Acceptance tests for steam turbine speed control systems

汽轮机转速控制系统验收试验

Standard Type
GBT
ICS
27.040
CCS
K54
Status
Active
Issue Date
2008-07-16
Implementation
2009-04-01
Centralized Committee
中国电器工业协会
Issuing Authority
中华人民共和国国家质量监督检验检疫总局、中国国家标准化管理委员会

Application Summary AI generated

This standard specifies the test methods, procedures, and acceptance criteria for verifying the performance of steam turbine speed control systems. It is applied during the commissioning and acceptance phases of steam turbines in power plants and industrial facilities to ensure the control system meets stability, response time, and accuracy requirements. The standard is used by turbine manufacturers, plant operators, and testing agencies to validate system functionality under both no-load and load conditions.

Related Standards

Transparency note: The application summary and key sentences on this page were automatically generated by AI from the standard's original text. This content has not been human-verified and should not be used for compliance or regulatory purposes. Always refer to the official standard document from the issuing authority.