GB/T 15579.4-2014
ActiveArc welding equipment—Part 4: Periodic inspection and testing
弧焊设备 第4部分:周期检查和试验
Application Summary AI generated
This standard specifies procedures for the periodic inspection and testing of arc welding equipment to ensure ongoing electrical safety and operational reliability. It is applied in industrial maintenance and workplace safety contexts, where welding machines must be regularly checked for insulation resistance, protective conductor continuity, and functional performance. The standard is used by testing laboratories, maintenance technicians, and safety inspectors to verify compliance with safety requirements during routine equipment audits.
Related Standards
GB/T 18591-2001
Welding - Guidance on the measurement of preheating temperature, interpass temperature and preheat maintenance temperature
GB/T 25774.2-2016
Test methods for welding consumables - Part 2: Preparation of single-run and two-run technique test specimens in steel
GB/T 15169-2003
Qualification test of welders--Fusion welding forsteels
GB/T 19419-2003
Welding coordination--Tasks and responsibilities
GB/T 12470-2003
Low-alloy steel electrodes and fluxes for submerged arc welding
GB/T 19418-2003
Arc-welded joints in steel--Guidance on quality levels for imperfections
GB/T 8366-2004
Resistance welding--Resistance welding equipment--Mechanical and electrical requirements
GB/Z 41107.3-2021
Destructive tests on welds in metallic materials—Hot cracking tests for weldments—Arc welding processes—Part 3:Externally loaded tests
Transparency note: The application summary and key sentences on this page were automatically generated by AI from the standard's original text. This content has not been human-verified and should not be used for compliance or regulatory purposes. Always refer to the official standard document from the issuing authority.