GB/T 15544.4-2017

Active

Short-circuit current calculation in three-phase a.c.systems—Part 4: Currents during two separate simultaneous line-to-earth short circuits and partial short-circuit currents flowing through earth

三相交流系统短路电流计算 第4部分:同时发生两个独立单相接地故障时的电流以及流过大地的电流

Standard Type
GBT
ICS
29.240.20
CCS
F20
Status
Active
Issue Date
2017-12-29
Implementation
2018-07-01
Centralized Committee
中国电力企业联合会
Issuing Authority
中华人民共和国国家质量监督检验检疫总局、中国国家标准化管理委员会

Application Summary AI generated

This standard specifies calculation methods for short-circuit currents during two separate simultaneous line-to-earth faults in three-phase AC systems, including the partial currents flowing through the earth. It is applied in electrical power system design and analysis, particularly for grounding system evaluation and protection coordination in high-voltage transmission and distribution networks. The standard ensures accurate fault current determination for safety and equipment sizing in utility and industrial power systems.

Related Standards

Transparency note: The application summary and key sentences on this page were automatically generated by AI from the standard's original text. This content has not been human-verified and should not be used for compliance or regulatory purposes. Always refer to the official standard document from the issuing authority.