GB/T 14099.3-2009

Active

Gas turbines - Procurement - Part 3: Design requirements

燃气轮机 采购 第3部分:设计要求

Standard Type
GBT
ICS
27.040
CCS
K56
Status
Active
Issue Date
2009-04-13
Implementation
2010-01-01
Centralized Committee
中国机械工业联合会
Issuing Authority
中国机械工业联合会

Application Summary AI generated

This standard specifies the design requirements for gas turbines during the procurement process, covering aspects such as performance, reliability, and safety. It is applied in the energy and power generation industries, particularly when procuring gas turbines for power plants, industrial cogeneration, or mechanical drive applications. The standard ensures that procured turbines meet consistent design criteria for integration into larger systems.

Related Standards

Transparency note: The application summary and key sentences on this page were automatically generated by AI from the standard's original text. This content has not been human-verified and should not be used for compliance or regulatory purposes. Always refer to the official standard document from the issuing authority.