GB/T 13231-1991

Active

Calculated methods of carrying capacity for receiving and dispatching tracks at railway marshalling station(3-stage/3-yard)

铁路编组站到发线通过能力计算方法 (三级三场)

Standard Type
GBT
ICS
03.220.30
CCS
S90
Status
Active
Issue Date
1991-10-31
Implementation
1992-07-01
Centralized Committee
国家铁路局
Issuing Authority
国家技术监督局

Application Summary AI generated

This standard specifies the calculation methods for determining the carrying capacity of receiving and dispatching tracks specifically within a three-stage, three-yard railway marshalling station configuration. It is applied in the planning, design, and operational management of large-scale railway hubs in China to ensure efficient train reception, departure, and classification processes. The standard provides a technical basis for optimizing track utilization and scheduling in complex marshalling yard environments.

Related Standards

Transparency note: The application summary and key sentences on this page were automatically generated by AI from the standard's original text. This content has not been human-verified and should not be used for compliance or regulatory purposes. Always refer to the official standard document from the issuing authority.