Application Summary AI generated
GB/T 10230.2-2007 provides application guidance for selecting, installing, and operating tap changers used in power transformers and similar electrical equipment. It is applied in the electrical power industry, specifically for on-load and off-circuit tap changers in distribution and transmission transformers. The standard ensures proper integration and performance of tap changers under varying load conditions, aiding engineers in system design and maintenance.
Related Standards
GB/Z 1094.14-2011
Power transformers - Part 14: Design and application of liquid-immersed transformers using high-temperature insulation material
GB/Z 34935-2017
Technical specifications for oil-immersed smart power transformers
GB/Z 20840.100-2023
Instrument transformers—Part 100: Guidance for application of current transformers in power system protection
GB/T 1094.10-2003
Power transformers--Part 10: Determination of sound levels
GB/T 1094.3-2003
Power transformers--Part 3: Insulation levels,dielectric tests and external clearances in air
GB/T 13499-2002
Power transformer--Application guide
GB/T 6451-1999
Specification and technical requirements for three-phase oil-immersed power transformers
GB/T 8554-1998
Transformers and inductors for use in electronic and telecommunication equipment--Measuring methodsand test procedures
Transparency note: The application summary and key sentences on this page were automatically generated by AI from the standard's original text. This content has not been human-verified and should not be used for compliance or regulatory purposes. Always refer to the official standard document from the issuing authority.