Application Summary AI generated
This standard specifies performance requirements and test methods for tap-changers used in power transformers. It is applied in the electrical power industry for manufacturing, testing, and verifying the reliability of on-load and off-circuit tap-changers in distribution and transmission transformers. The standard ensures consistent voltage regulation and safe operation under various load conditions.
Related Standards
GB/Z 1094.14-2011
Power transformers - Part 14: Design and application of liquid-immersed transformers using high-temperature insulation material
GB/Z 34935-2017
Technical specifications for oil-immersed smart power transformers
GB/Z 20840.100-2023
Instrument transformers—Part 100: Guidance for application of current transformers in power system protection
GB/T 1094.10-2003
Power transformers--Part 10: Determination of sound levels
GB/T 1094.3-2003
Power transformers--Part 3: Insulation levels,dielectric tests and external clearances in air
GB/T 13499-2002
Power transformer--Application guide
GB/T 6451-1999
Specification and technical requirements for three-phase oil-immersed power transformers
GB/T 8554-1998
Transformers and inductors for use in electronic and telecommunication equipment--Measuring methodsand test procedures
Transparency note: The application summary and key sentences on this page were automatically generated by AI from the standard's original text. This content has not been human-verified and should not be used for compliance or regulatory purposes. Always refer to the official standard document from the issuing authority.