GB 32032-2015
AbolishedThe norm of energy consumption per unit products of gold mining
金矿开采单位产品能源消耗限额
Application Summary AI generated
GB 32032-2015 sets mandatory maximum energy consumption limits per unit of gold ore processed or gold produced, covering both open-pit and underground mining operations. It applies to gold mining enterprises in China for production management, energy auditing, and regulatory compliance, ensuring that energy use per ton of ore or per kilogram of gold remains within specified thresholds. The standard is used by mining companies, government inspectors, and energy auditors to evaluate and improve energy efficiency in the gold mining industry.
Related Standards
GB/Z 18718-2002
Energy saving directives for heat treatment
GB/T 33857-2017
General principles for energy conservation assessment—Combined heat and power generation project
GB/T 19064-2003
Solar home system specifications and test procedure
GB/T 18293-2001
On-line measurement on operating efficiency of power convertor equipments
GB/T 18292-2001
Economical operation of boilers for daily life
GB/T 15320-2001
Evaluation guides of the energy conservation products
GB/T 2588-2000
The general principles for calculation of thermal effic-iency of equipment
GB/T 17954-2000
Economical operation of industrial boilers
Transparency note: The application summary and key sentences on this page were automatically generated by AI from the standard's original text. This content has not been human-verified and should not be used for compliance or regulatory purposes. Always refer to the official standard document from the issuing authority.