GB 25034-2010
AbolishedGas-fired heating and hot water combi-boilers
燃气采暖热水炉
Application Summary AI generated
GB 25034-2010 specifies safety, performance, and energy efficiency requirements for gas-fired combi-boilers that provide both space heating and domestic hot water. It is applied in residential and commercial building construction, particularly for wall-mounted or floor-standing boilers using natural gas or liquefied petroleum gas. The standard governs product certification, quality inspection, and installation compliance in China’s heating and hot water supply systems.
Related Standards
GB/T 19249-2003
Reverse osmosis water treatment equipment
GB/T 16895.3-2004
Electrical installations of buildings--Part 5-54:Selection and erection of electrical equipment--Earthing arrangements,protective conductors and protective bonding conductors
GB/T 7725-2004
Room air conditioners
GB/T 16895.22-2004
Electrical instal lations of buildings--Part 5-53:Selection and erection of electrical equipment isolation,switching and control--Section 534:Devices for protection against overvoltages
GB/Z 28597-2012
Lifts and escalators subject to seismic conditions - Compilation report
GB/Z 28598-2012
Study of the use of lifts for evacuation during an emergency
GB/Z 31822-2015
Study report on the safety requirements of public service escalators and moving walks
GB/Z 35850.3-2021
Programmable electronic systems in safety-related applications for lifts (elevators), escalators and moving walks—Part 3: Life cycle guideline for programmable electronic systems related to PESSRAL and PESSRAE
Transparency note: The application summary and key sentences on this page were automatically generated by AI from the standard's original text. This content has not been human-verified and should not be used for compliance or regulatory purposes. Always refer to the official standard document from the issuing authority.